Heat & Glo • LUX60 • 4062-116 • Rev. G • 4/11 37
D. Disassemble Vent Sections
Rotate either section (see Figure 10.9) so the seams
on both pipe sections are aligned as shown in Figure
10.10.
Pull carefully to separate the pieces of pipe.
Figure 10.10 Align and Disassemble Vent Sections
Figure 10.9 Rotate Seams for Disassembly
E. Install Metal Roof Flashing
See minimum vent heights for various pitched roofs
(Figure 10.11) to determine the length of pipe to extend
through the roof.
Slide the roof ashing over the pipe sections extending
through the roof as shown in Figure 10.12.
Horizontal
overhang
12
X
20 in.
(508 mm)
Lowest
Discharge
Opening
Termination
Cap
Roof Pitch
is X / 12
Vertical
wall
H (min.) - Minimum height
from roof to lowest
discharge opening.
24 in. min.
(610 mm)
Roof Pitch H (Min.) Ft. Roof Pitch H (Min.) Ft.
Flat to 6/12 1.0* Over 11/12 to 12/12 4.0
Over 6/12 to 7/12 1.25* Over 12/12 to 14/12 5.0
Over 7/12 to 8/12 1.5* Over 14/12 to 16/12 6.0
Over 8/12 to 9/12 2.0* Over 16/12 to 18/12 7.0
Over 9/12 to 10/12 2.5 Over 18/12 to 20/12 7.5
Over 10/12 to 11/12 3.25 Over 20/12 to 21/12 8.0
* 3 ft. minimum in snow regions
Storm Collar
Roof
Flashing
Figure 10.11 Minimum Height From Roof To Lowest Discharge
Opening
Figure 10.12 Caulking
CAULK
NOTICE: Failure to properly caulk the roof ashing and
pipe seams may permit entry of water.
Caulk the gap between the roof ashing and the outside
diameter of the pipe.
Caulk the perimeter of the ashing where it contacts the
roof surface. See Figure 10.15.
Caulk the overlap seam of any exposed pipe sections
that are located above the roof line.